Sales Compensation Software Benchmark
Download
Qobra for

Sales commissions that run on your Salesforce data

Opportunities, products, accounts, custom objects: Qobra connects natively to Salesforce and calculates every commission on the same deal data your reps already see in the CRM. No exports, no middleware, no spreadsheet in between.

Rated 4.8/5 with 1,000+ reviews

Blue cloud-shaped sign with the white text 'salesforce' mounted on the exterior of a modern glass and metal building.

“With Qobra, we can make plan changes very quickly. It took us one day to implement all the 2026 plans.With Qobra, we can make plan changes very quickly. It took us one day to implement all the 2026 plans.”

Author Name
Author Role
Man with blond hair and blue eyes wearing a dark gray sweater, sitting at a desk with arms crossed, looking directly at the camera with a slight smile in a blurred indoor setting.

“By using Qobra we ensure data reliability because we’re linked to our CRM in real time.”

Man with dark hair speaking into a microphone during an indoor event, with an audience member visible from behind in the foreground.
Théo Manachem
Sales Ops at SeLoger
Geometric design with a central cluster of small orange dots surrounded symmetrically by larger circles in orange, purple, and yellow gradient colors arranged in a star-like pattern.

Connect in seconds, not in a project.

Authenticate with Salesforce OAuth, pick the objects and fields you need, and your data is in Qobra. Standard and custom objects, custom fields, formula fields: no engineering, no CSV exports to maintain.

Abstract geometric pattern of concentric circles and dots arranged in a diamond shape with gradient colors transitioning from purple in the center to cream and orange on the outer edges.

Always up to date, safely.

Incremental syncs every 2 hours, or in one click. Qobra reads from Salesforce instantly and lets you override any value in-app if needed, without ever touching the CRM record.

Circular arrangement of small to medium gradient circles in orange and purple hues forming a ring-like pattern.

Comp where your reps already work.

Add Qobra inside Salesforce. Reps check their statements, simulate their bonus, and raise requests without leaving the CRM, with SSO to log in.

How Qobra does it

Native Salesforce connector.

Any object, any field

Opportunities, opportunity products, accounts, users, and any custom object or field you map. Field types are detected automatically from Salesforce, and link fields between tables are set up for you.

Standard objects
Custom objects
Formula fields

Filter with a SOQL query

Only sync what matters: add a WHERE clause to any synced table (closed-won only, current fiscal year, a given record type) to keep tables light and calculations fast.

SOQL
Filter
Instant imports

Beyond the CRM

Combine Salesforce with your HRIS (Workday, BambooHR, HiBob), your warehouse (Snowflake, BigQuery), or NetSuite when plans pay on invoices, collections, or usage. One platform, every data source.

Workday
HiBob
Snowflake

Real-time commissions.

Incremental sync every 2 hours

All relevant records are pulled automatically, so statements reflect the latest Closed Won deals within the day. Reps can also trigger a refresh themselves from their statement.

Every 2 hours
One-click refresh
Same-day updates

Nightly full refresh

Every night, Qobra reloads your tables from scratch, including Salesforce formula fields, so your data never drifts from the CRM.

Nightly reload
Formula fields
Zero drift

Read-only by design

Qobra never edits or sends data to Salesforce. Adjust any synced value in-app when you need to (splits, overrides, manual corrections) without touching the CRM record, and keep a full audit trail of every change.

Read-only
In-app overrides
Audit trail
Dashboard showing monthly payments with a bar chart from January to December and a highlighted total of $17,146.94 for September 2027. Booking Commission details include total paid for September at $7,618.31, annual ARR target of $980,000, and closed won ARR of $871,090. Target achievement is 88.89% with a circular progress chart. Ranking on Target shows three people ranked with the first two in yellow and the third in orange, labeled #3. An acceleration curve graph shows a rising trend ending at $57,776.38.

Qobra inside Salesforce.

Embedded Qobra tab

Add Qobra as a tab in Salesforce so reps and managers see statements, quotas, and payouts where they already spend their day. Single sign-on included.

Salesforce tab
SSO
Statements

Transparency that motivates

A rep closes a deal in Salesforce and sees its impact on their commission in Qobra, with a what-if simulator to project the quarter. Fewer questions to RevOps, more deals closed.

What-if simulator
Real-time impact
Fewer questions

Users matched automatically

Import your Salesforce users into Qobra and every opportunity is attributed to the right rep based on the Salesforce user ID. New hires show up, leavers drop off, no manual mapping.

User matching
Auto-attribution
Joiners and leavers

Meet the three AI agents
that give you your week back.

The word 'qobra' in bold lowercase black letters with a stylized arrow pointing up and to the right as part of the letter 'a'.

Sales comp management,
on autopilot

The Architect

Your plan builder that creates, edits and simulates commission plans for you.

The Sales Coach

Answers every rep question, so you don't have to.

The Analyst

Catches commission errors before your reps do.

Build and test commission plans instantly. Describe a plan in plain language, update ten plans in one prompt, and simulate the result on historical payouts before anything reaches your reps.

Build and edit plans in natural language
Onboard new admins in hours, not weeks
Simulate before you launch
Meet the Architect

Answer every rep question, automatically. "How much will I earn if I close this deal?" "Why was my commission this amount?" The Sales Coach explains each statement with concrete examples, so reps trust their numbers and stop pinging RevOps.

Cut rep questions by 90%
Let reps simulate earnings in real time
Make every plan self-explaining
Meet the Sales Coach

Catch commission errors before payout. The Analyst reconciles data across plans, tracks quota attainment and pay versus performance, and alerts your team before payroll turns into a fire drill.

Reconcile every plan automatically
Track the metrics that matter
Get alerted before errors cost you
Meet the Analyst
3xFaster to implement
“I will say the Architect has been off the charts good. It really is incredible, so I don't see this being a massive lift like in the past.”
Smiling man with glasses and short dark hair wearing a light beige quarter-zip sweater, sitting in front of a purple backdrop with a lion head logo.
Khaled AlSaleh
Head of RevOps at incident.io

Qobra MCP Server

Use Qobra from Claude, ChatGPT or any MCP-compatible assistant. Pull commission data, trigger actions, and build custom workflows that run themselves, with your Qobra permissions applied to every request.

Circular logo with a soft pastel gradient in cream, peach, and lavender colors featuring the text ‘qobra’ in bold black lowercase letters with a rightward arrow integrated into the letter ‘a.’Two small blurred purple comet shapes diagonally positioned.
01
02
03
04
White stylized letter G with a superscript 2 inside a solid orange circle.
4.8/5
with 1,000+ reviews
View all customer stories
“I would say the tooling is very simple. You can see where the variables are coming from, so it was very easy and quick for our team.”
Jessica Ho, RevOps Manager at ElevenLabs
Watch the ElevenLabs story
“Since we’ve had Qobra, we’ve seen between 15 and 20% progress towards our objectives.”
Fabian Q. Veit, CEO at Make
Watch the Make story
“It’s more the fact that I just don’t have to worry about commissions anymore.”
Chris Cook, RevOps Director at GoCardless
Watch the GoCardless story
“At the end of every period, when we run commissions right now, we do a simple check with our finance team, and that’s it.”
Derek Boelig, VP RevOps at DataSnipper
Watch the DataSnipper story
Integrations

Plugs into the tools you already use

Qobra connects natively to your CRM, data warehouse, HRIS and ERP, so commissions run on the same data, refreshed in real time. And yes, you can still make manual adjustments.

View all integrations
CRM & ERP
HRIS
Circular icon with concentric gray and black rings surrounding a center circle that has a soft pastel gradient and features the word 'qobra' in black lowercase letters with a rotated arrow pointing upward to the right.
Data Warehouses & Databases
File Storage Systems
Qobra MCP Server
Use Qobra from Claude, ChatGPT or any MCP-compatible assistant. Pull commission data, trigger actions, and build custom workflows that run themselves, with your Qobra permissions applied to every request.

Security and Control

Enterprise-grade security built into every layer.

Time back. More trust.
Their words, not ours.

Man in a blue sweater sitting on a chair in front of a ping pong table with a colorful collage of posters and artwork on the wall behind him.
“Qobra increased my team’s confidence, which directly impacts sales performance.”
Watch the GoCardless story
Smiling young woman with medium-length dark hair wearing a red blouse, standing outdoors with blurred urban background.
RevOps Manager
ElevenLabs
“I don’t really get questions anymore. Reps can see exactly what they’re paid on, and it saves me a lot of time.”



Portrait of a smiling woman with straight shoulder-length light brown hair wearing a black top, against a plain light gray background.
VP Global Sales
DataSnipper
“Qobra has significantly improved my team’s productivity. They no longer have to calculate their commissions manually, and it gives them more confidence in the process.”
Smiling man with short dark hair and beard wearing a light green blazer and white shirt, sitting against a white wall with a blue edge on the left.
RevOps Manager
DataSnipper
“Reps can ask themselves: if I close this $100K deal, how much more commission will I make? That little extra can motivate them to close.”
A man with a beard wearing a purple shirt and dark pants sitting on a blue sectional sofa with two white pillows labeled 'datasnipper' in a room with a large green plant and a wall decorated with photos.
“We went from 14 to 18 days to 2 days, sometimes 1.”
Watch the DataSnipper story

Your frequently asked questions

Yes. Qobra has a native Salesforce connector configured from the admin console with the Salesforce OAuth flow. Opportunities, opportunity products, accounts, users, and any custom object or field sync into Qobra, with no engineering or middleware required.

Salesforce is built to track deals, not to run compensation plans. Accelerators, ramp-ups, clawbacks, multi-level approvals, payroll exports, and rep statements all need logic and workflows the CRM does not provide natively, and custom-building them means code to maintain. Qobra reads the deal data from Salesforce and handles everything else: calculation, validation, statements, and AI agents.

Modified records are synced automatically every 2 hours, and any user can trigger a refresh from Qobra. A full refresh runs every night to reload all tables, including Salesforce formula fields. The automatic frequency can be adjusted with our support team if needed.

No. The integration is read-only: Qobra never edits or sends data to your Salesforce org, which means you can safely connect your production environment. Commission amounts live in Qobra and can be exported to payroll, your HRIS, or through the API and webhooks.

Yes. Any standard or custom object and field can be mapped, field types are detected automatically, and formula fields are refreshed during the nightly full sync. You can also filter each synced table with a SOQL WHERE clause.

Yes. Qobra can be added as a tab in Salesforce, with SSO, so reps check their statements, simulate their bonus, and raise requests without leaving the CRM.

Qobra connects to your other sources alongside Salesforce: HRIS (Workday, BambooHR, HiBob) for people data, data warehouses and databases (Snowflake, BigQuery, PostgreSQL, and more) and NetSuite for invoices, collections, or usage, plus SFTP, CSV, and a public API. Every source feeds the same calculation engine.

Authentication goes through the Salesforce OAuth flow, the integration is read-only, and access in Qobra is governed by role-based permissions and a full audit trail. Qobra is SOC 2 Type II certified and GDPR compliant. See our Security page for more details.

Connecting Salesforce takes minutes: authenticate, pick your objects and fields, and sync. Going live on Qobra typically takes weeks, not months: our team maps your plans with you, The Architect drafts them from your comp documents, and you run Qobra in parallel with your current process before switching payroll over.